27.10.2026 16:48

Frodsham Solar development consent decision announced

United Kingdom CMA – Competition and Markets Authority Unknown author
Rozhodnutí o vydání rozvoje doručené pro Frodsham Solar: DCO bylo dnes uděleno Ministerstvu pro energetickou jistotu a net zero. Žádost o solární fotovoltaický systém s kapacitou přes 50 MW byla posouzena a doporučení k vydání bylo předáno vládnímu činiteli, přičemž veřejnost a dotčené strany měly možnost podat svědectví v šestiměsíčním řízení. Celá procedura byla ukončena v rámci zákonného časového rámce a výsledky včetně důkazů a doporučení jsou veřejně dostupné na stránkách National Infrastructure Planning.
AI summary

The Frodsham Solar DCO application has today been granted development consent by the Department for Energy Security and Net Zero.

The application is for a Solar photovoltaic array with an electrical generating capacity of over 50MW comprising solar PV modules and related mounting structures, inverters, transformers, switch gear and control equipment, a substation, and underground on and off-site cabling, as well as associated energy storage equipment.

The application was submitted to the Planning Inspectorate for consideration by Frodsham Solar Ltd on 30 May 2025 and accepted for examination on 27 June 2025.

Following an examination during which the public, statutory consultees and interested parties were given the opportunity to give evidence to the Examining Authority, recommendations were made to the Secretary of State on 29 July 2026.  

This is the 116th energy application out of 184 applications examined to date and was again completed by the Planning Inspectorate within the statutory timescale laid down in the Planning Act 2008.  

Local communities continue to be given the opportunity of being involved in the examination of projects that may affect them. Local people, the local authority and other interested parties were able to participate in this six-month examination.  

The Examining Authority listened and gave full consideration to all local views and the evidence gathered during the examination before making its recommendation to the Secretary of State. 

The decision, the recommendation made by the Examining Authority to the Secretary of State for Energy Security and Net Zero and the evidence considered by the Examining Authority in reaching its recommendation are publicly available on the project pages of the National Infrastructure Planning website. 

This decision was made by Baroness Curran on behalf of the Energy Secretary’s legal authority.

Journalists wanting further information should contact the Planning Inspectorate Press Office, on 0303 444 5004 or 0303 444 5005 or email:  

[email protected]

https://www.gov.uk/government/news/frodsham-solar-development-consent-decision-announced